Skip to main content
Multi · Network operators

Supply Point Lookup

Decode any MPAN and read the published rates that apply to it.

For operators, consultants and engineers who need the DUoS, TNUoS and BSUoS rates for a supply point without opening the charging statements.

Try Supply Point Lookup
Supply Point Lookup · rate card
Charges for this supply point · 2026-27 · published rates

Distribution · DUoS

ComponentRateUnit
Red24.204p/kWh
Amber1.930p/kWh
Green0.211p/kWh
Fixed18.02p/day
Capacity0.00p/kVA/day
Exceeded capacity0.00p/kVA/day
Reactive power0.000p/kVArh

Transmission · TNUoS

ComponentRateUnit
Zonal NHH (South Western)2.0711p/kWh
TDR band: no agreed capacity on a Profile Class 03 meter, so the band follows annual consumption. Half-hourly sites enter their agreed capacity here to see the band held and its £/day rate.

Balancing · BSUoS

ComponentRateUnit
Fixed tariff 71.3740p/kWh
Fixed tariff 81.2490p/kWh
Tariff 7 covers Apr to Sep 2026, tariff 8 covers Oct 2026 to Mar 2027. Source document and charging period for every row sit in the Assumptions disclosure.

The journey

Four steps, one rate card

From a single meter number to DNO region, tariff, time bands and the published rates for that supply point.

1

Enter

Enter a meter number

Type an MPAN for an Elec supply point, or switch to Gas and enter an MPRN. One number is all you need. No consumption figure, no dates, no configuration.

Step 1 · Input panel
Fuel
ElecGas
MPAN
22 7614 385 2097
Decode supply point
2

Identify

Confirm supply point identity

The MPAN is decoded into DNO region, Distributor ID, LLFC, profile class, market segment, tariff category, connection voltage and TNUoS zone, with the SSC and TPR codes and the exact Red, Amber and Green hours for the region. Every fact is read from the digits, not guessed.

Step 2 · MPAN decode
MPAN 22 7614 385 2097 decoded

Supply point identity

DNO regionNGED South West
Distributor ID22
LLFC110
Profile classPC03
Market segmentLV Non-Domestic
TariffNon-Domestic Aggregated Band 1
TNUoS zone14 South Western
Voltage levelLV

Settlement · SSC 0393 · TPR 00001

SSC0393
TPR00001
TPR descriptionAll times
Registers1 (unrestricted)
BandHoursMonthshrs/yr
Red16:00-19:00 weekdaysAll year780
Amber07:00-16:00, 19:00-22:00 weekdaysAll year3,130
GreenAll remaining periodsEvenings, weekends, nights4,850
3

Rates

Read the published rate card

Every published rate that applies to the supply point, sectioned by network layer: DUoS from the DNO charging statement (or the site-specific EDCM tariff on an EHV connection), the TNUoS zonal rate, and BSUoS for each period. Half-hourly sites enter their agreed capacity to see the TDR band held and its daily rate. Rates only: no consumption goes in and no totals come out.

Step 3 · Rate card
Charges for this supply point · 2026-27 · published rates

Distribution · DUoS

ComponentRateUnit
Red24.204p/kWh
Amber1.930p/kWh
Green0.211p/kWh
Fixed18.02p/day
Capacity0.00p/kVA/day
Exceeded capacity0.00p/kVA/day
Reactive power0.000p/kVArh

Transmission · TNUoS

ComponentRateUnit
Zonal NHH (South Western)2.0711p/kWh
TDR band: no agreed capacity on a Profile Class 03 meter, so the band follows annual consumption. Half-hourly sites enter their agreed capacity here to see the band held and its £/day rate.

Balancing · BSUoS

ComponentRateUnit
Fixed tariff 71.3740p/kWh
Fixed tariff 81.2490p/kWh
Tariff 7 covers Apr to Sep 2026, tariff 8 covers Oct 2026 to Mar 2027. Source document and charging period for every row sit in the Assumptions disclosure.
4

Gas

Gas supply points decoded too

Switch to Gas and enter the MPRN with a postcode. The tool resolves GDN, Local Distribution Zone, exit zone and AQ band eligibility from a single lookup, with all applicable transportation charge codes listed.

Step 4 · Gas decode
MPRN 8910 1112 130 decoded
GDNCadent Gas
LDZNW
LDZ nameNorth West
Exit zoneNW601
Network typeGDN Direct
AQ bandMid-tier
Mid-tier AQ band (73,200 to 732,000 kWh/yr). Applicable charges: ZCA, ZCO, CCA/CFI, ECN, SOLR. Customer charges confirmed once AQ is entered.

The problem

The rates for one supply point sit in several documents

An MPAN encodes the DNO region, voltage and metering arrangement, and those facts decide which DUoS tariff, TNUoS zone and TDR band apply. Finding the rates themselves means opening the DNO charging statement, the NESO tariff tables and the BSUoS notice, and reading each one correctly. Gas MPRNs need a postcode lookup before the GDN and LDZ are known.

Read the wrong tariff or band and every figure built on it is wrong: forecasts, contract negotiations and charge checks alike.

Why it matters

What you walk away with

Full MPAN Decode

DNO region, Distributor ID, LLFC, Profile Class, tariff category, SSC and TPR, and the DUoS time band hours for the region.

Published Rate Card

The DUoS, TNUoS and BSUoS rates for the supply point, sectioned by network layer, with the charging period and source document behind each row.

TNUoS Zone and TDR Band

The zone and its zonal rate, and, for a half-hourly site once the agreed capacity is entered, the TDR band held and its daily rate.

Gas Network Information

GDN, LDZ region, exit zone and AQ band thresholds for any gas supply point.

Built on official published rates

14
DNO regions
4
GDNs
13
LDZs
CDCM + EDCM
DUoS rate cards

FAQ

Answers, before you ask

The published DUoS, TNUoS and BSUoS rates for the supply point in the current charging year. DUoS comes from the DNO's CDCM charging statement, or the site-specific EDCM tariff for an EHV connection. TNUoS is the zonal rate for the supply point's zone, plus the TDR band and its daily rate once you enter the agreed capacity. BSUoS is shown for each published period. It shows rates only: no consumption goes in and no totals come out. To turn the rates into a cost, use Portfolio Forecast.

Still curious? Email hello@energycode.ai

Decode any meter number and read its rates.

DNO region, tariff, time bands and the published DUoS, TNUoS and BSUoS rates, all from a single MPAN. MPRNs decode to GDN and LDZ.