Generators and batteries of 50 kW and up from the six DNO capacity registers, on one map. Open a site for its connection, the names and company we matched to it, and its published DUoS rates.

For brokers and TPIs with clients that generate on site, consultancies, PPA origination teams and connection consultants.

Try Generation World
Generation World · site page
NGEDSolar11 kV · 4.99 MW

Hollins Lane Solar

Accredited operator (Ofgem) · Newark · East Midlands

Names

DNO register, Ofgem and REPD, each labelled

Company

Hollins Lane Solar Ltd · Active

Connection

Staythorpe GSP · connected 2016

Charges 2026/27

Likely tariff: HV Generation Site Specific

-0.912 p/kWh

Red unit rate, published for the region. Not this site's own tariff.

Ofgem accredited station

Matched by postcode, technology and capacity

Planning (REPD)

Probable match

The journey

From the map to one site

Find a site on the map or by search. Then read what the DNO publishes about it, who we could match to it, and the rates for its region and voltage.

1

Find

Find the site

The map opens on every site we can place, coloured by technology. Search by site name, postcode or MPAN, or filter by DNO region and technology: solar, wind, storage, hydro, bioenergy, fossil and more.

Step 1 · Site map
Site name, postcode or MPAN
Region
East Midlands (NGED)
SolarWindStorageHydroBioFossilOtherUnknown
2

Connection

Read the connection as the DNO publishes it

Technology, size, voltage, MPAN and date connected, with the grid supply point, bulk supply point and primary substation. Each figure comes from the DNO register, with its date.

Step 2 · Connection
ConnectionDNO register
TechnologySolar
Size4.99 MW
Voltage11 kV
MPAN11 0000 0000 000
Connected3 Jun 2016
NetworkStaythorpe GSP · Hollins BSP
DNO Embedded Capacity Register (NGED), as of 14 Aug 2026.
3

Names

See who is behind it, and how sure we are

The name on the DNO register can be the installer, so we show it under that label next to the Ofgem accredited operator and the planning database operator. The company comes from Companies House with the evidence for the match, and a match on one signal says Probable.

Step 3 · Names and company
NamesSource
Name on DNO registerBrightwire Installations Ltd
Accredited operator (Ofgem)Hollins Lane Solar Ltd
Operator (REPD)Hollins Lane Solar Ltd · Probable
CompanyCompanies House
CompanyHollins Lane Solar Ltd
StatusActive
Activity (SIC)35110 Production of electricity
MatchConfirmed by two sources
Planning (REPD)Probable match
4

Charges

Check the published DUoS rates

For an HV or LV site, the DNO's published generation rates for the region and voltage, labelled as the likely tariff, because the register gives no LLFC. For an EHV site we link to EHV World, its own EDCM tariff.

Step 4 · Charges

Charges · 2026/27

Likely tariff: HV Generation Site Specific

The register gives no LLFC, so this is not this site's own tariff.

HV Generation Site Specific

Red-0.912 p/kWh
Amber-0.104 p/kWh
Green-0.011 p/kWh
Fixed0.00 p/day
Reactive power0.124 p/kVArh
DNO CDCM charging statement, East Midlands, 2026/27.

The problem

One generation site, five public registers

The DNO register holds the capacity, voltage and MPAN. Ofgem holds the accredited operator, the planning database holds the developer, Companies House holds the company and the Capacity Market register holds any agreement. No two of them share a site reference.

You match names and postcodes by hand, one site at a time, and still cannot tell whether the name on the register belongs to the owner or the installer.

Why it matters

What you walk away with

Six Registers, One Map

Sites from all six DNO registers, coloured by technology. Filter by region and technology, or search by name, postcode or MPAN.

The Connection as Published

Technology, capacity, storage size, voltage, date connected and MPAN, with the grid supply point, bulk supply point and primary substation the DNO lists.

Names Kept Apart

The name on the DNO register, the Ofgem accredited operator and the planning database operator, each under its own label.

The Company and Its Match

Company status, activity and accounts from Companies House, with the evidence behind the match. A match that rests on one signal says Probable.

Published Rates

The DNO's published DUoS generation rates for the site's region and voltage, or the site's own EDCM tariff for an EHV site.

Gaps Stated

Where a register publishes no name, postcode or size, the site page says so and names the DNO.

Built on published public records

13,644
Generator and battery sites
6
DNO capacity registers
Labelled
Every match, confirmed or probable
Sourced
Every fact, with its date

FAQ

Answers, before you ask

A map of the generators and batteries of 50 kW or more on the six DNO Embedded Capacity Registers, plus the sites whose register entry gives no size. Each site has one page: what the DNO publishes about the connection, the names and company we matched to it, and the published DUoS rates for its region and voltage.

Still curious? Email hello@energycode.ai