Skip to main content

CDCM

Common Distribution Charging Methodology

Industry Bodies

The standardised charging system used by all 14 DNOs since April 2022, ensuring consistent tariff categories and calculation methods across the country.

Before CDCM, each DNO had slightly different approaches to naming and structuring their tariffs, making comparison difficult. Since April 2022, all DNOs use the same 32 standardised tariff categories with consistent naming conventions.

The 32 CDCM tariff categories:

Domestic (2):

  • DOM_AGG - Domestic Aggregated
  • DOM_AGG_REL - Domestic Related MPAN

Non-Domestic Aggregated (6):

  • ND_AGG_NR - No Residual
  • ND_AGG_B1 through ND_AGG_B4 - Bands 1-4
  • ND_AGG_REL - Related MPAN

LV Site Specific (5):

  • LV_SS_NR, LV_SS_B1 through LV_SS_B4

LV Sub Site Specific (5):

  • LVS_SS_NR, LVS_SS_B1 through LVS_SS_B4

HV Site Specific (5):

  • HV_SS_NR, HV_SS_B1 through HV_SS_B4

Generation (8):

  • LV_GEN_AGG, LVS_GEN_AGG, LV_GEN_SS, LVS_GEN_SS, HV_GEN_SS
  • Plus NRP (No RP Charge) variants

Unmetered (1):

  • UMS - Unmetered Supplies

This standardisation makes it much easier to understand and compare distribution charges across regions. The same tariff category means the same thing whether you're in London (DNO 12) or the Scottish Highlands (DNO 17) - only the actual rates differ.

Example

ND_AGG_B2 = Non-Domestic Aggregated Band 2 (100-499 kVA agreed capacity)

Related terms

Put this into practice

Explore EnergyCode's charge tools to model DUoS, TNUoS, gas transportation and policy costs against your own sites.

Explore the charge tools